Sl | Project Name | Year | Main Contractor | Consultants | Place |
---|---|---|---|---|---|
1 | 224 Bloom Heights G+4P+2 Towers 29&24 Floors | 2020 | Al Oroba Contracting Co. LLC. | M/s Al Khwaja Engineering Consultancy,Dubai | Dubai |
2 | Azizi Aura Tower | 2020 | Al Qandeel Contracting LLC | M/s Pioneers of Experts Engineering Consultants (POE) | Dubai |
3 | 5JJ 42/52 Marina Tower | 2020 | Mint Technical Services LLC | M/s. Dewan Architects, Engineers & Planners (Dubai) | Dubai |
4 | DAMAC Akoya Oxygen Cluster N2&M1Villa Project | 2020 | THE SECOND CONSTRUCTION CO.LTD OF CHINA CONSTRUCTION THIRD ENGINEERING BUREAU | M/s. Engineering Consortium | Dubai |
5 | Qasr Al Hosn Project | 2020 | Zublin Construction LLC | M/s. AL AHMADIAH CONT. & TRDG. | Abu Dhabi |
6 | Al Masoudy ( 45) | 2020 | Al Massa Architectural General Contracting | N/A | Abu Dhabi |
7 | 220 Bloom Towers-G+4P+l - 3 Towers | 2020 | Al Oroba Contracting Co. LLC. | M/s Al Khwaja Engineering Consultancy,Dubai | Dubai |
8 | Hassyan Energy PJSC 4x600MW Clean Coal Power Plant | 2020 | Harbin Electric International Co. LTD-Dubai Branch | M/s. Ch2m | Dubai |
9 | 427-Fish Market | 2020 | Amana Contracting & Steel Buildings | M/s. Arcadis | Abu Dhabi |
10 | AFC131 Residential Building for Prescott @ Meydan | 2020 | Al Fada Contracting & General Maintenance LLC | M/s. NEB | Dubai |
11 | Sea World | 2020 | ALEC Engineering and Contracting LLC | M/s. AECOM | Abu Dhabi |
12 | 47/P143 YAS ACRES,Plot No.37 Sectore Yas Island | 2020 | Emirates Link Maltauro L.L.C | M/s. AECOM | Abu Dhabi |
13 | Sector W64 Plot 2-P4 Traditional Souq | 2020 | Malaih Investment & Projects Development | M/s. AVANTGARDE Architects & Engineers | Abu Dhabi |
14 | Rahba Court Musanda | 2020 | National Innovative General Maintenance LLC | M/s. Arcal Engineering Consultant | Abu Dhabi |
15 | 48/P-144 C10- Najmat TowerPlot # RR3 C-10 Najmat-Reem Island | 2020 | Emirates Link Maltauro L.L.C | M/s. Unii Engineering Consultant | Abu Dhabi |
16 | PRUDENTIAL TOWERS | 2020 | Societe D’ Entp Entp & Gestion Emirates Cont. LLC | M/s. Al Hilal Engineering Consultants. | Dubai |
17 | SPML Project-VIDA -Marina | 2020 | Bajrang singh tiles and marbles fixing L.L.C. | M/s. Killa Design: Killa Architectural Design | Dubai |
18 | Al Raha Beach (503 - 504) | 2020 | A&M International Gen. Cont. LLC. | M/s. Pioneer Engineering Consultancy L.L.C | Abu Dhabi |
19 | Akoya Oxygen Virdis (G+14) | 2020 | Al Qandeel Contracting LLC | Dubai | |
20 | 40-137 Sail TowerRBW8 C20 Al Raha Beach | 2020 | Emirates Link Maltauro L.L.C | M/s. MZ Architects | Abu Dhabi |
21 | P145-CONSTRUCTION OF CATEGORY CLUB VILLA | 2020 | PIVOT Eng & Gen Contg | M/s. UA ARCHITECTS | Dubai |
22 | Stella Maris Tower, Dubai Marina | 2020 | BBC Building Contracting LLC. | M/s. LACASA | Dubai |
23 | Plot P01, The Makers District | 2020 | THE SECOND CONSTRUCTION CO.LTD OF CHINA CONSTRUCTION THIRD ENGINEERING BUREAU | M/s. Ramboll | Abu Dhabi |
24 | AFC130-Building @ Bu Shagrah, | 2020 | Al Fada Contracting & General Maintenance LLC | M/s. | Sharjah |
25 | BOND STORAGE-DIC SITE DSO SITE& LOR EXPO 2020 | 2020 | AAA Concrete Floors | Dubai | |
26 | Club Villas ( 150 No. Villas ) PA-07 Dubai Hills Estate | 2020 | PIVOT Eng & Gen Contg | M/s. UA ARCHITECTS | Dubai |
27 | Aweer Power Station H Phase 1V | 2020 | THE SECOND CONSTRUCTION CO.LTD OF CHINA CONSTRUCTION THIRD ENGINEERING BUREAU | M/s. ECG | Dubai |
28 | Bloom Towers | 2020 | Al Oroba Contracting Co. LLC. | M/s Al Khwaja Engineering Consultancy,Dubai | Dubai |
29 | Al Shamka 22 | 2020 | Al Massa Al Bronzia General Contracting | N/A | Abu Dhabi |
30 | Ummm Sequiem Post Office | 2019 | ESNAD BUILDINGS CONTRACTING COMPANY | Dubai | |
31 | RBWB C-20 AL RAHA BEACH | 2019 | Emirates Link Maltauro L.L.C | M/s. MZ Architects | Abu Dhabi |
32 | Wadi Al Safa | 2019 | Mint Technical Services LLC | Dubai | |
33 | M-12, Masdar City | 2019 | Al Rakha Cont. & Gen. Transport LLC | M/s. Architecture and Planning Group APG PMC -GHD | Abu Dhabi |
34 | 1315 Wafi Hotel Complex,Phase 8,Plot No.3153804 | 2019 | TAAG Interiors & Construction | M/s. Arkiteknik Consultants | Dubai |
35 | C005 Phase 2 | 2019 | MS Construction LLC | M/s. KEO | Dubai |
36 | Societe D’ Entp & Gestion Emirates Cont. LLC | 2019 | DOVRONBECK RESIDENTIAL BUILDING JVC | M/s. POE Architects and Engineers | Dubai |
37 | VIP Villa | 2019 | Schroeder Construction LLC | M/s. Kunooz Eng. Consultants | Abu Dhabi |
38 | SILAA LADIES CLUB -MUSANDA | 2019 | National Innovative General Maintenance LLC | M/s. MUSANADA | Abu Dhabi |
39 | Miral Yas Village | 2019 | Al Rakha Cont.& Gen.Transport LLC | M/S. KEO INTERNATIONAL | Abu Dhabi |
40 | Deira Dubai | 2019 | Al Ghurair Contracting & Engineering Works L.L.C. | N/A | Dubai |
41 | PRIVATE VIP RESIDENCEPLOT RR6-4 NAJMAT AL REEM ISLAND | 2019 | Centroid Construction Est | Abu Dhabi | |
42 | Fitout Najmat, Reem Island | 2019 | Modular General Contracting LLC | M/s. E11 Engineering Consultancy | Dubai |
43 | Dubai Marina Development 52-42 OnPlot 5JJ (Plot No.392-418 | 2019 | Shapoorji Pallonji | M/s. Dewan Architects, Engineers & Planners (Dubai) | Dubai |
44 | Wafi Hotel Complex & Cinema Expansion | 2019 | Hepta Water Proofing and Thermal Insulation LLC. | M/s. Arkiteknik Consultants | Dubai |
45 | AFC128-Azizi Hotel & Residential BLDG.Al Furjan | 2019 | Al Fada Contracting & General Maintenance LLC | M/s. Engineer-CV Tech | Dubai |
46 | ANWA TOWER BUR DUBAI | 2019 | Reem Capital Contracting LLC | M/s. NAGA Engineering Consultant | Dubai |
47 | G02,AL KABEESI BUILDING,AL KABEESI | 2019 | Pearl Touch Technical Services L.L.C | M/s. MKM | Dubai |
48 | KH-Residence 2B+G+S+Roof Apartments Building on Plot No. 5981336 | 2019 | Tefco International Contracting LLC | Dubai | |
49 | ZAYED SPORT CITY | 2019 | Emirates Link Maltauro L.L.C | M/s. Althorath Consultant | Abu Dhabi |
50 | AD-420 Specialised Rehabilitation Hospital | 2019 | Eastern International LLC | N/A | Abu Dhabi |
51 | Plot No.409 Mafraq Industrial Area | 2019 | Trojan General Contracting LLC | Abu Dhabi | |
52 | Wafi Hotel Complex & Mall Expansion | 2019 | Sky Pacific Building Contracting L.L.C | M/s. MKM | Dubai |
53 | Mismak Residential & commercial Reem Island | 2019 | Seidco General Contracting Co.LLC | M/s. GA Architects & Engineers | Abu Dhabi |
54 | Expo Village Development 2020 | 2019 | Shapoorji Pallonji | M/s. KEO | Dubai |
55 | Hassyan Energy PJSC,CLEAN COAL POWER PLANT | 2019 | THE SECOND CONSTRUCTION CO.LTD OF CHINA CONSTRUCTION THIRD ENGINEERING BUREAU | Dubai | |
56 | Al Bahia | 2019 | Al Massa Al Bonzia General Contracting | N/A | Abu Dhabi |
57 | 4659/17 Crown Project Furjan | 2019 | Ishtar Total Contracting | Dubai | |
58 | Proposed (B+G+4) Residential Building on Plot No. JVC13GMRP006, Al Barsha South Fourth, JVC. | 2018 | Infinity Noble Constructions LLC | Emsquare Engineering Dubai Consultant Architects & Civil Engineers | Dubai |
59 | AZIZI HOTEL APARTMENT DUBAI | 2018 | Al Fada Contracting & General Maintenance LLC | M/s. Azizi Development | Dubai |
60 | Emergency Pipeline Repair System (EPRS) Construction of Marine Base | 2018 | Hadeed Emirates | Bainona Engineering Consultancy | Abu Dhabi |
61 | AD - 9043 Jebel Ali Park Hotel | 2018 | DUTCO | Brewer Smith Brewer Gulf | Dubai |
62 | Dubai Hills Business Park 1 | 2018 | Shapoorji Pallonji | Design & Architecture Bureau DAR | Dubai |
63 | Ittihad Papermill Factory | 2018 | CATIC | Coener Consulting Group | Abu Dhabi |
64 | Media City Hotel - Dubai | 2018 | AAA Concrete Floors | ArchGroup Architect | Dubai |
65 | Golf Maintenance Facility Dubai Hills | 2018 | AAA Concrete Floors | BHNS Engineering Consultant | Dubai |
66 | Ducon Site | 2018 | AAA Concrete Floors | DUCON | Dubai |
67 | Onyx | 2018 | AAA Concrete Floors | ASGC | Dubai |
68 | Al Paya Station - Meydan | 2018 | Al Fada Contracting & General Maintenance LLC | N/A | Dubai |
69 | Azizi Hotel | 2018 | Al Fada Contracting & General Maintenance LLC | 360 consultancy | Dubai |
70 | AFC127-Abdullah Khalfa Building(@, Musaffah | 2018 | Al Fada Contracting & General Maintenance LLC | American Consultancy | Abu Dhabi |
71 | Dubai Land | 2018 | Al Rashad Contracting | Eng. Adnan Saffarini Office - Dubai Land Project Distribution | Dubai |
72 | Costra at IMPZ | 2018 | Armada Contracting | Model Engineering Consultant | Dubai |
73 | Plot 1003 Al Mankhoul Dubai | 2018 | Beaver Gulf | STUDIO Intl Eng. Constultant | Dubai |
74 | City Mall | 2018 | CATIC | Hill International | Dubai |
75 | DIC building | 2018 | Concord Stars | N/A | Dubai |
76 | The Bridges Phase 1 & 2 | 2018 | Construction General Contracting House Ltd. | AECOM | Abu Dhabi |
77 | Manar - DAMAC | 2018 | Dar Al Adham | LACASA | Dubai |
78 | Tabreed Offices | 2018 | GCS German Concrete | Al Asri | Dubai |
79 | JVC Residential Building | 2018 | Hadeed Emirates | N/A | Dubai |
80 | Construction of lulu Hypermarket & Department store ( G+R) | 2018 | Jazal Engineering Construction | MWhite Young | Abu Dhabi |
81 | Price Mansion Dubai Hills | 2018 | Techno Civil Engineering Contracting LLC | Signature Engineering Consultant | Dubai |
82 | 52-42 Towers | 2018 | Shapoorji Pallonji | Diwan Artechitects & Eng | Dubai |
83 | Mudon Views po4 Tower | 2018 | Parkway International Contracting | N/A | Dubai |
84 | Serena Cosa Dora Phase 2 | 2018 | PIVOT Eng & Gen Contg | Diwan Artechitects & Eng | Dubai |
85 | Dubai Hills Business Park | 2018 | Shapoorji Pallonji | DAR I WME Consultants | Dubai |
86 | Emaar South Town Houses | 2018 | PIVOT Eng & Gen Contg | UA Architects | Dubai |
87 | Acacia -Dubai Hills | 2018 | Sobha Engineering & Contracting | NEB | Dubai |
88 | Soho Square Towers | 2018 | Emirates Lik Maltauro | MZ Architects | Abu Dhabi |
89 | Abu-Dhabi International Airport | 2017 | Pivot Eng & Gen Contg | AECOM | Abu-Dhabi |
90 | Ministry of justice & federal courts complex | 2017 | Emirates Lik Maltauro | Hill International | Abu-Dhabi |
91 | Green Community extension 3 | 2017 | Shapoorji Pallonji Mideast | Dewa Architects & Eng | Dubai |
92 | National Dairy Plant | 2017 | Algeco | MHA | Alain |
93 | Meraas | 2017 | Shapoorji Pallonji Mideast | Arif & Bintoak | Dubai |
94 | Hotel appartments | 2017 | Reem Capital Contracting | Conin | Dubai |
95 | Res & Com Building | 2017 | Merhis International contracting | Makan Consulting Eng | UAQ |
96 | Marsa Al Seef | 2017 | Ductco Balfour Beatty LLC | ATK Engineering | Dubai |
97 | Park view Towers | 2017 | National Holding Al Mojil | MZ Architects | Abu Dhabi |
98 | Meydan Residences 1 | 2016 | El Seif Eng & Contg Co | Ae 7 | Dubai |
99 | Meydan Shobha | 2016 | MS Construction | Ae 7 | Dubai |
100 | Meeras Development | 2016 | Shapoorji Pallonji Mideast | Arif & Bintoak | Dubai |
101 | Mussafah Gardens | 2016 | Pivot Eng & Gen Contg | James Cubitt & partners | Abu-Dhabi |
102 | Bolly Wood Park | 2016 | Ascon | Dynamic Eng Consultants | Dubai |
103 | Bloom Garden Development | 2016 | Emirates Lik Maltauro | Khatib & Alami | Abu-Dhabi |
104 | Alain stadium & mixed use Dev | 2016 | BAM International | EC Harris Int’l Ltd | Alain |
105 | Tecom 400 villas | 2016 | Ascon | Khatib & Alami | Dubai |
106 | Zayed Military City | 2016 | Frontier Work Organisation | Syrconsult | Abu-Dhabi |
107 | Club Villas at Palm Jumeirah | 2015 | Teejan Tradg & Contg | Designer East | Dubai |
108 | Emirates National School | 2015 | Ghantoot Group | Heberger Engineering | RAK |
109 | ADNOC Guest House | 2015 | Al Shafar General Contracting | Architucture Plan’g Group | Ruwais |
110 | Midfield Int’l Airport | 2015 | CCC/TAV | AECOM/Jocobs | Abu-Dhabi |
111 | Marina Bloom Development | 2015 | Al Shafar General Contracting | Khatib & Alami | Abu-Dhabi |
112 | Meeras Development | 2015 | Shapoorji Pallonji Mideast | Arif & Bintoak | Dubai |
113 | Bawabat Al Sharq- Phase II | 2015 | Emirates Link Maltauro | AECOM | Abu-Dhabi |
114 | Pharma Link Medical Stores | 2015 | Hashim Contracting | Al Burj Engineering | Abu-Dhabi |
115 | 5 Majlis for Shk Mansoor | 2015 | Ghantoot Group | Ewan Eng consultants | Sila/ Mirfa |
116 | G+8 Res Bldg at Al Safouh | 2015 | Dubai walls Construction | Emaquare Eng Consultant | Dubai |
117 | G+11 Res Bldg at Silicon Oasis | 2015 | Al Liwan General Contracting | Khatib & Alami | Dubai |
118 | Mosque at Mussafah Sannayah | 2015 | Royal International Construction | Al Suweidi Eng Bureau | Abu-Dhabi |
119 | Muscat International Airport | 2014 | Carrilion Alawi | Hill International | Oman |
120 | Al Maktoum Hospital | 2014 | Al Rostamani Pegel | Bel-Yoahah | Dubai |
121 | Le Merridian Hotel | 2014 | Al Futtaim Carrilion | Archgroup Int’l Consultant | Dubai |
122 | Com bldg at Al Muhaisanah | 2014 | Naresco Contracting | Al Ajmi consultants | Dubai |
123 | Moon Tower | 2014 | Ahmed Bin Dasmal | Tameer Eng Consultants | Dubai |
124 | Villa Complex | 2014 | Al Karbash | Bel-Yohah Architects | Dubai |
125 | Mohebi Buildings | 2014 | General Construction Company | National Engin’g Bureau | Dubai |
126 | Marriot Hotel | 2013 | Shapoorji Pallonji Mideast | Heberger Engineering | Abu Dhabi |
127 | 500Villas in living legend | 2013 | Delta Emirates | Al Burj Engineering | Dubai |
128 | Bloom Academy | 2013 | Al Rostamani Pegel | Broadway Maylan | Alain |
129 | Acacia Avenue Res Bldg | 2013 | Modern Executive System Contg | BHDS | Dubai |
130 | Danat Al Emarat Hospital | 2013 | Terna SA Gek Terna Group | ECG | Adu-dhabi |
131 | Mosque | 2013 | Orient House for Development | Al Ain Consult’g Enginer | Abu Dhabi |
132 | Bawabat Al Sharq School | 2013 | Chicago Maint & Construction | NEB Eng Consultants | Abu-Dhabi |
133 | Ware house cum Cold Storage | 2013 | Hashim Contracting | Al Manhal Eng Consultant | Abu-Dhabi |
134 | Batinah Coastal Housing Project | 2012 | Radic construction | Consult’g Office Develop. | Oman |
135 | G+17 Comm & Res tower | 2012 | Zarooni Transemirates Contg | LACASA Architects | Abu Dhabi |
136 | Bawabat Al Sharq Phase II | 2012 | Royal International Construction | World planners | Abu Dhabi |
137 | 354 Saadiyat Beach Villas | 2012 | Al Jaber Building LLC | White Young Emirates | Abu Dhabi |
138 | ADISC Res leisure Compound | 2012 | Fibrex industrial & construction | Engin’g Consultans Group | Abu Dhabi |
139 | Ruwais Shopping Mall | 2012 | GDM/Gulf Contractors | Adnoc | Ruwais - |
140 | New York University | 2012 | Al Futtaim Carillion | RVA | Abu Dhabi |
141 | Emirati Housing Community | 2012 | Tafseer Cont & Gen Maint. | PACE | Abu Dhabi |
142 | City of Lights at Al Reem Island | 2012 | China State Constrn Eng Corpor. | P & T Architect & Eng Ltd | Abu Dhabi |
143 | Hydra Village | 2011 | Pal Technology Servces | NEB Engin’g consultancy | Abu Dhabi |
144 | Mixed Dev, City of lights | 2011 | CSHk Dubai Contracting | KDI Architects | Abu-Dhabi |
145 | UAE Armed Forces military | 2011 | Trojan Gen Contracting | Syrconsult consulting Eng | Abu Dhabi |
146 | Villa Complex | 2011 | Al Sahel Technical Facilities | Architectural & Enginering | Abu Dhabi |
147 | Al Falah Dev, 4850 Villas | 2011 | ALSIF | Fluor | Abu Dhabi |
148 | Commercial Tower | 2011 | Dubai Civil Engineering | Mazaya Consulting T.N.Q. | Sharjah |
149 | Masdar City | 2011 | Amana Wilbridge | WSP Consulting | Abu Dhabi |
150 | 134 Town house at Gardens | 2010 | Acico Int’l Contstruction | Dimension Eng Consulting | Dubai |
151 | St. Regis Hotel & Resorts | 2010 | Al Habtoor & Murray Roberts | Atkins | Abu-Dhabi |
152 | G+24 Com Building | 2010 | Modern Bldg Contg.Company | Bel-Yohah Architectural | Dubai |
153 | Com. Tower | 2010 | Emirates links and Maltauro | Heberger | Abu Dhabi |
154 | Adnoc housing Complex | 2010 | System Construct | Adnoc | Ruwais |
155 | The Bay Central at Marina | 2010 | Dubai Civil Engineering | NEB Consultants | Dubai |
156 | Latifah Tower | 2010 | Al-Rostmani Pegel L.L.C. | Arkiplan | Dubai |
157 | Twin Towers | 2010 | Acico Int’l Cont. | Dimension Consulting | Dubai |
158 | Com tower -Tecom investments | 2010 | A B Building Contracting | Bel-Yohah Eng consultants | Dubai |
159 | Torch Tower | 2009 | Dubai Civil Engineering | NEB Consultant | Dubai |
160 | Zayed University | 2009 | Al Habtoor & MurrayRoberts JV | Atkins | Abu Dhabi |
161 | Capital Center | 2009 | Mann Contracting | Gahzi Awad | Abu Dhabi |
162 | Ministry of Finance | 2009 | Al Dhabi Contracting | Al Swaidi Consulting | Abu Dhabi |
163 | Police Head Quarters | 2009 | Al Radeem Gen.Cont. | Dar Al Khaleej | Abu Dhabi |
164 | Twin Bulidings | 2009 | Gulf Eagle Contracting | Adnan Saffarini Consulting | Abu Dhabi |
165 | Remraam housing project | 2008 | Dubai Civil Engineering | Conin | Dubai |
166 | Infinity Tower | 2008 | Arabtec Contracting | Khatib and Abmi | Dubai |
167 | Queen’s Palace Hotel | 2008 | Gulf Eagle Contracting | Adnan Saffarini Consulting | Abu Dhabi |